Azad Dam Water Diversion Tunnel

The main goal of construction of this dam is to provide water for agricultural lands in Kurdistan and also providing drinking water for Sanandaj City. Furthermore with having an adjustable reservoir capacity of 350 million cubic meters per year, it is to rotate turbines with a capacity of 10 megawatt. Azad dam is a rockfill dam with clay core which is 125 m high.

Project Organization

Employer: Iran Water Resources Development Co.
Consulting Engineers: Mahab Ghods consulting engineering
Contractor: Gharnis Co.
Contractor manager: Shahran Saze Co.

General volumes

Drilling in rock: 48,300 m3 in 760 m of tunnel
Concreting: 7,300 m3
Grouting: 16,400 m
Consolidation: 35,000 m2
Soil Excavation: 20,800 m3

General Layout

Video

© 2015 Shahran Sazeh Construction Company. All Rights Reserved.

Design & Support By Raasen Informatics

thời trang trẻ emWordpress Themes Total Freetư vấn xây nhàthời trang trẻ emshop giày nữdownload wordpress pluginsmẫu biệt thự đẹpepichouseáo sơ mi nữHouse Design Blog - Interior Design and Architecture Inspiration