Vabel Mineral Water Factory

Water supply for Vabel mineral water factory for producing bottled mineral water

Project Organization

Employer: Vanel Noush Ziar Co.
Consulting Engineers: Yekom Consulting Engineers
Contractor: Shahran Saze

General volumes

Excavation and drilling the pipe path and access road: 10,000 m3
Execution of pipe line: 4,700 m length and 6 inch diameter
Construction of concrete basin and their lids along the pipe line

General Layout

Video

© 2015 Shahran Sazeh Construction Company. All Rights Reserved.

Design & Support By Raasen Informatics

thời trang trẻ emWordpress Themes Total Freetư vấn xây nhàthời trang trẻ emshop giày nữdownload wordpress pluginsmẫu biệt thự đẹpepichouseáo sơ mi nữHouse Design Blog - Interior Design and Architecture Inspiration