Uma Oya Underground Power Plant

• Generating 120 megawatt hydroelectric energy to electrification the deorived areas in Sri Lanka
• Water transmission, development and improvement agricultural lands in downstream the river

Project Organization

Employer: Sri Lanka Ministry of Irrigation and Water Resources Management
Consulting Engineers: joint ventureof Pöyry- Mahab Ghods consulting engineering
Contractor: joint venture of Shahran Saze-Nimrokh

General volumes

Excavation and drilling: 68,000 m3
Concreting: 12,225 m3
Consolidation: 38,000 m2
Rock bolt (DCP): 27,150 m
Reinforcement: 1,200 ton
Steel fiber reinforced Shotcrete: 5,000 m3