Khersan3 Dam

• annual production of 1,121 gigawatt hours of hydroelectric energy (682 gigawatt hours as the primary energy and 439 gigawatt hours as secondary energy)
• Flood controlling
• Increasing the energy production in downstream dams
• Controlling the river sediments and increasing the lifetime of downstream dams
• Job creation within the district
• development of fish farming and dependent industries
• improving tourism industry
• Reducing greenhouse gas emissions

Project Organization

Employer: Iran Water Resources Development Co.
Consulting Engineers: Aban Pazhouh consulting engineers
Contractor of dam body, portal structure of diversion tunnel and employer-consultant camp: Jahad tosse foundation
Contract manager: Shahran Saze Co.

General volumes

Excavation:730,000 m3
concreting: 1,200,000 m3
concreting in portal structure of diversion dam: 11,931 m3
Shotcrete: 2,000 m3
Employer and consultant camp: 9,000m2

General Layout

Video

© 2015 Shahran Sazeh Construction Company. All Rights Reserved.

Design & Support By Raasen Informatics

thời trang trẻ emWordpress Themes Total Freetư vấn xây nhàthời trang trẻ emshop giày nữdownload wordpress pluginsmẫu biệt thự đẹpepichouseáo sơ mi nữHouse Design Blog - Interior Design and Architecture Inspiration