Amirkabir Tunnel and Underpass

Amirkabir tunnel starts from Aminhozur three-way and at the end connects to the Imam Ali highway by a ramp. The overall length of this route is 2500 meter and its main task is to dispatch the traffic in busy hour of day and also connecting downtown and bazaar to Imam Ali highway.
This project will also provide 486 parking spaces and Plays a major role in solving the problem of shortage of parking area.

Project Organization

Employer: and Development Organization of Tehran City (EDOTC)
Consulting Engineers: joint ventureof Omran Pazhouhesh Rahvar-D2 consult
Contractor: joint venture of Shahran Saze-Nimrokh-Arsa Sakhteman

General volumes

Shotcrete: 295,000 m3
Drilling: 250,000 m3
Excavation: 11,000 m3
Concreting: 120,000 m3
Reinforcement: 12,300 ton
Tunnel formwork: 35,000 m2
formwork: 90,500 m2
Steel Structure: 1,500ton

General Layout